top of page
Circuit Board

Project and Success Story

Project: Projects
Project-PUSRI_edited.jpg

Demineralization Water Plant

 System Built-up: 5000 Points

 Duration: 2014 Q4 – 2015 Q3


•A fertilizer facility located at Palembang Indonesia

•System design & development:

Water Treatment

•Design process system such as clarifier process, pressure sand filter process, active carbon filter process, reverse osmosis process and mixed bed process

•Allow end-users to enhance the efficiency of fertilizer production

Project_MarinaOne_edited.jpg

Pneumatic Refuse Collection System

 System Built-up: 2000 Points

 Duration: 2015 Q2 – 2017 Q2


•Integrated mixed-use development located at the heart of Singapore’s vibrant new central business district


•System design & development:

Pneumatic Refuse Collection System (PRCS)


•A type of waste disposal system that uses air to move refuses to designed collection points through pipes


•Optimization of manpower for waste collection through a fully automated system

Project-DataCentre1.jpg

Data Centre

 System Built-up: 10000 Points

 Duration: 2015 Q2 – 2017 Q3


•Located at Kim Chuan, Singapore

•System design & development:

Data Centre Infrastructure Management (DCIM)

•Monitoring equipment such as CRAC, FCU, UPS, iPDU, Inline-meter, Water Leak Detecting System & etc.


•Different access level to limit different user access on the system

Project_Data

Data Centre

 System Built-up: 130000 Points

 Duration: 2017 Q3 – 2018 Q4


•Located at Woodlands, Singapore

•System design & development:

Building Management System (BMS)

Electrical Power Monitoring System (EPMS)

•Design control sequence of chiller plants, ACMV equipment (e.g. AHU, FCU, PAU, fans, dampers) and purging system

•Monitor equipment status, report generation, and assigned access level for different users

Project_DataCentre3.jpg

Data Centre

 System Built-up: 30000 Points

 Duration: 2015 Q2 – 2017 Q3


•Located at Sunview Drive, Singapore

•System design & development:

Data Centre Infrastructure Management (DCIM)

•Monitoring equipment such as DRUPS, GENSET, HVSB, LVSB, CRAC, FCU, Chiller & etc.

•Allow customer to generate report, e.g. Greenmark report

Project_CovanceCLS.jpg

Biomedical

 System Built-up:  5000 Points

 Duration: 2018 Q1 – 2019 Q2


•A laboratory facility located in Singapore which serving 16 countries in the Asia Pacific region

•System design & development:

AHU control system

•Design AHU control system and monitoring clean room condition via various sensor

Project_ChestNutAvenue.jpg

Public Utilities Board (PUB)

 System Built-up: 6000 Points

 Duration: 2016 Q4 – 2021 Q3


•Singapore’s first and largest waterworks that meet WHO standard, located at Chestnut Avenue


•System design & development:

Waste Water Treatment


•Design control sequence of Bio-activated Carbon (BAC) system


•Monitor water treatment equipment such as backwash pump, air scour blower, filter & etc.

bottom of page